  • Rialto has taken a stringent target to became carbon Neutral by 2028 and Net Zero Facility by 2040.
  • Rialto has installed a 730 kWp, Rooftop Solar Plant, which has helped CO2 emission reduction of about 822 MT CO2e.
  • Having covered 100% roof area with a Solar Rooftop plant, Rialto installed 1 MW of Offsite Solar power at Kamuthi, Ramanthapuram district to further reduce its GHG Emission from its operation, which further reduces 1145 MTCO2e.
  • We also purchase green power from Indian Power Exchange which is 6% of our requirement.
  • With the addition of a 1 MW solar power plant our Renewable energy share is 61%.